Project Overview
A local contractor contacted First Line Striping at 8:30 PM with an urgent need: a freshly paved section of Fort Harrison Ave in downtown Clearwater needed temporary street parking lines restored before the project could be completed.
By 9:00 PM, First Line Striping was on-site and ready to work.
The markings were temporary and will later be replaced with permanent thermoplastic striping, but without the temporary layout, the contractor could not properly finish and reopen the area.