Preparing Multiple Parking Areas
Before sealcoating and striping, both parking areas had to be thoroughly cleaned and prepared. This step is one of the most important parts of the process, but it is often overlooked.
For this project, we used an 8-foot diesel broom and spent nearly a full 12-hour day cleaning both lots. Dirt, sand, loose asphalt, and debris can prevent sealcoat from bonding properly to the pavement.
By taking the time to fully clean the surface first, we helped ensure the sealcoat could adhere correctly and create a cleaner, longer-lasting finish. During preparation, we also identified worn asphalt, cracks, damaged areas, and potholes that needed to be repaired before the final sealcoat and striping were applied.